With the passing of time, various improvements were made in order to continue growing as well as contribute to nation-building by providing construction services throughout the country.
The first significant growth occurred in 1972, when the name Perusahaan Negara Widjaja Karja was changed to PT Wijaya Karya. WIKA then developed into a construction contractor by handling various important projects such as the installation of electricity grids at Asahan and the Jatiluhur irrigation project.
A decade later, in 1982, WIKA underwent expansion with the establishment of several new divisions, namely the Construction Civil Division, Building Division, Housing Facilities Division, Concrete and Metal Products Division, Industrial Construction Division, Energy Division, and Commerce Division. The projects handled at the time included among others the LIPI Building, the Bukopin Building, and the Building and Irrigation Project. Moreover, with the progressive growth of its subsidiaries in the industrial sector WIKA was transformed into an integrated and synergetic infrastructure company.
The skills of WIKA personnel in the construction industry have pushed the Company to further explore the various areas in which it does business by establishing a number of subsidiaries in order that they can become independent as business ventures that specializes in creating their own respective products. In 1997, WIKA founded its first subsidiary company, namely PT Wijaya Karya Beton, a reflection of how fast the Concrete Division was growing in WIKA at the time.
PT Wijaya Karya Beton's activity at the time , among others, is the provision of rail tracks for the construction of the Manggarai double-track lane in Jakarta, the construction of the Grati Steam-powered Power Station (PLTGU) and also the Barelang Bridge in Batam. The PT Wijaya Karya Beton measure was then followed by the establishment of PT Wijaya Karya Realty in 2000 as a natural progression of the Realty Division. Subsequently in the same year PT Wijaya Karya Intrade was also established as the progression of the Industrial and Commercial Division.
As the Company developed more and more, so too did the public's confidence in the Company's capability. This was reflected in WIKA's success in launching its Initial Public Offering/IPO on 27 October 2007 at the Indonesia Stock Exchange (known at the time as the Jakarta Stock Exchange). During the IPO, WIKA released 28.46 percent of its shares to the public, so that the government of the Republic of Indonesia held 68.42 percent, while the rest was owned by the public, including WIKA employees, through the Employee/ Management of Stock of Option Program (E/MSOP), and Employee Stock Allocation (ESA).
Meanwhile, the measure of developing Divisions into selfsufficient subsidiary companies continued to be taken. In 2008 WIKA established subsidiary company PT Wijaya Karya Gedung that specializes in the development of high rise buildings. WIKA also acquired 70.08 percent shares of PT Catur Insan Pertiwi that specializes in the field of mechanical-electrical. Then PT Catur Insan Pertiwi was renamed into PT Wijaya Karya Insan Pertiwi. In 2009, together with PT Jasa Sarana and RMI, established PT Wijaya Karya Jabar Power specializes in the development of geothermal power station (PLTP) projects.
In the mid of 2009, WIKA together with other companies have succeded in completing the Suramadu Bridge, a prestigious project that connects Java and Madura islands. Currently the project have been enjoyed by the community at large.
Entering 2010, WIKA is faced with a changing business environment with greater challenges. Thus, WIKA has defined a new vision which is the Vision 2020, to become one of the best integrated EPC and Investment Companies in South East Asia. The vision is believed to provide direction to every WIKA's line of business to achieve optimum growth, healthy and sustainable.
Lead Electrical Engineer
* Male
* S1 Electrical (reputable university)
* Having 3-5 years work experiences in Power Plant Project
* Experience in Power Plant is preference
* Familiar with Panel, Cable, Tray, Trafo, Ups, etc, Bulk Material
* Familiar with related Code & Standard (IEC, ANSI, IEEE, NEC), Equipment Sizing (MCC, SWGR, TRANSFORMER, EDG, UPS, DC System), System Study, Data Sheet
* Has experience in design, installation, pre-com/commissioning and start-up electrical equipment for power plant.
* Familiar with electrical engineering software such as ETAP
Lead Process Engineer
* Male
* S1 Chemical Engineering (reputable university)
* Min 3-5 years work experiences
* Experience in Power Plant Project is preference
* Familiar with related Code & Std, Process Description, PFD, PID, Material & Heat Balace, Thermodinamic, Process Control Philosophy, Operating Phylosophi. Preferable understood Precomm & Comm
* Has experience in design, installation, pre-commissioning, commissioning and start-up instrumentation & control for power plant.
Lead Instrument Engineer
* Male
* S1 Electrical / Instrument / Engineering Physics (reputable university)
* Min 3-5 years work experiences
* Experience in Power Plant Project is preference
* Familiar with related Code and std (ISA, API, ASTM, ASME) PLC, DCS, SCADA, Field Instrument, Loop Diagram, Hook Up
* Has experience in design, installation, pre-commissioning, commissioning and start-up instrumentation & control for power plant
Senior Electrical Engineer
* Male
* S1 Electrical (reputable university)
* Min 6 years work experiences
* Experience in Power Plant is preference
* Familiar with electrical engineering code & standard for Power Plant application
* Has experience in design, installation, pre-com/commissioning and start-up electrical equipment for power plant.
* Familiar with electrical engineering software such as ETAP
Senior Instrument & Control Engineer
* Male
* S1 Engineering Physics (reputable university)
* Min 6 years work experiences
* Experience in Power Plant Project is preference
* Familiar with Instrument & Control engineering code & standard for Power Plant application
* Has experience in design, installation, pre-commissioning, commissioning and start-up instrumentation & control for power plant
Lead Mechanical Engineer
* Male
* S1 Mechanical (reputable university)
* Minimum 5 years experience as Mechanical Engineer of Designing, Maintenance or Construction in power plant project
* Advance knowledge in pump and pumping and skill in Hydraulic calculation & thermodynamic
* Applied knowledge of mechanic of material and machine elements & Project Management
* Basic knowledge of safety environment (LOTO, permit system, lifting, rigging, scaffolding, fire protection, hydrocarbon management, etc)
* Basic knowledge of material & welding inspection
* Understand well with API, ANSI, ASTM, ASME
* Understand well with other design and construction of process facilities modification, upgrade, or new design
* Understand well with pipe stress analysis, Caesar & Fluid flow and modeling software
QA / QC Inspector
* Male
* S1 Electrical / Mechanical (reputable university)
* Min 4 years work experiences
* Experience in Power Plant Project is preference
* Has experience in installation, inspection & test, pre-commissioning, and commissioning for power plant.
* Familiar with code and standard for site inspection and test electrical equipments for power plant application.
* Familiar with site inspection & test, pre-com/commissioning report procedure
OTHERS :
* Ready for remote area
* Working under pressure
* Fluently in English
* Microsoft Office / Open Office (Microsoft word, Microsoft excel, Microsoft Project, Microsoft Power Point)
Please send your CV and application to:
job-wika@wika.co.id
mentioning the position applied in the subject of the email before 26 Agustus 2011